Name: Stainless Steel Water Bottle

Type: SDO-BC100

【Back】

Parameters

Products Data:
Name: 33oz 1000ml double wall s/s vacuum water bottle with big handle
Drinkware Type: Wide Mouth Water Bottles
Bottle Color: One color powder coating,two color powder coating
Logo: Laser,silk-screen,air transfer,heat transfer printing,etc
CTN Meas: 41.2*31.4*31.2cm
Keep cold & hot: More than 24 Hours

Product advantages:

1. Low price: we are a production factory without middlemen, and price accounting is basically material cost accounting. Compared with traders, our price will be lower.

2. Unique design: One of the advantages of our factory is that we have our own design team. Our designers will design our cups according to customers' preferences and comfort. The comfortable handle and large mouth diameter of this sports water bottle make you feel very good. Two capacities can meet your needs for different capacities.

3. Inner plug design: many other cups with wide openings have poor thermal insulation performance. But the advantage of our cup is that our mouth is larger than other sizes on the market, but we use the inner plug to design the lid, which will greatly improve the thermal insulation performance. Therefore, this cup is superior to others in terms of thermal insulation performance.

 

FAQ:

1. Can you provide samples?

Yes.If you are interested in our products, you can contact us. We will arrange to send you samples. My contact information:sales2@zjsdo.net

2. Can we customize the samples?

Yes.You can provide us with the design, color or logo you want. We will provide you with specific proofing scheme according to your specific requirements. After your confirmation, we will arrange the proofing. Generally, the sampling time is 7-10 days.

3. How much is the cost of sample production?

The first step of sample making is to select the specific production process according to the effect of the customer's specific requirements. Different production processes require different costs. So if you want to know the specific cost, you can contact our business department and they will give you a specific quotation.

4. How long is the delivery time after placing the order?

Generally, our delivery time is 35 working days after the deposit arrives.

Wendy Bao.jpg


Contact us

You have any good comments, you can contact us

Copyright:ZHEJIANG STEEL INDUSTRY AND TRADE CO.,LTD