Name: Tumbler

Type: SDO-M004-24

【Back】

Parameters

Product Name

Wholesale Stainless Steel Double Walled Skinny Straight Cups 20oz Rainbow Glitter Sublimation Blanks Tumbler

 

Material

SS304

Performance

Keep cold & Hot

Color

Customized

Package

Bubble Bag+Egg Crate or according to your request

Trade Terms

FOB,CIF,CFR,DDP,DAP,DDU

Certificate

LFGB,FDA,BPA Free


Model

SDO-M004-24OZ

Capacity

708ML

Packing

24PCS

N.W

9.7KGS

G.W

11.7KGS

Meas

45*33.8*50.5cm

Type:Wholesale Stainless Steel Double Walled Skinny Straight Cups 20oz Rainbow Glitter Sublimation Blanks Tumbler

Finishing: painting;powder coating;air transfer printing, water transfer printing,UV ,etc.

Sample Time:7-10days

Lead Time: 45 days

Payment & Shipping

Payment ways:T/T,L/C,DP,DA,Paypal and others

Payment terms:30% T/T in advance,70% T/T balance against B/L copy

Loading port:NINGBO or SHANGHAI port

Shipping:DHL,TNT,LCL,loading container

About Package

Inner box and carton box


FAQ:

 

1.What is the your minimum order quantity? Depends on the products and your customization requirements. For spot goods, we can accept any quantity you want, mixed colors are also acceptable. Please contact us for the details. Thank you!

2.Can I get a sample for quality checking first? Yes! Standard samples and customized samples are both acceptable. Sample charge will be refunded when the order is up to a certain quantity after sample approval.

3.Can I put my own logo on the products? Yes, we accept custom orders. You can send us your design and quantity needed, we will check and confirm the most economic logo printing methods and cost for you.

4.What documents do you need if I want my own design? You can provide the file in format of JPG, AI, cdr or PDF, etc. We have our own designer to make the design renderings for your confirmation.

5.How long is the sample lead time? For standard samples: 2-7 days. For custom samples: 7-15 days, subject to your specific designs.

6.How long is the production lead time? RTS (spot goods) : 1-3 days Small batch production: about 10-15 days Mass production: 25-35 days after receiving your confirmation of order details and deposit.

  

construction area: 36000 square meters

Employees:about 460

sales amount in 2021: about USD20,000,000

Daily output:60000pcs/day


DJ SHU.jpg


Contact us

You have any good comments, you can contact us

Copyright:ZHEJIANG STEEL INDUSTRY AND TRADE CO.,LTD